Motorists intending to use Mombasa Road from Saturday, June 14 evening to Sunday, June 15 morning should brace themselves for heavy traffic congestion.
The Kenya National Highways Authority (KeNHA) has announced that there will be a temporary traffic disruption at Naivas JKIA section along the aforementioned road.
“[KeNHA] wishes to notify the public that a section of Mombasa Road (A8) near Naivas JKIA will experience traffic disruption along the Mombasa bound Service lanes from Saturday, 14th June, 2025 at 9.00pm to Sunday, 15th June, 2025 at 10.00am,” KeNHA announced.
The Authority says the traffic disruption is meant to pave way for the installation of the fabricated footbridge beams of the Syokimau Railway Footbridge.
“KeNHA advises motorists to follow the proposed traffic management plan below and cooperate with the police and traffic marshals on site,” KeNHA adds.
A map of the proposed traffic management plan
